After the derecho storm in August, it was determined the two large middle window units (one on the north side and one on the south side) needed to be replaced in the sanctuary as well as the carpet.
The new carpet has been installed and the walls have a fresh coat of paint. The windows are still in the process of being ordered and/or getting a date set for installation.